From content velocity to campaign confidence

AI made it cheap to create hundreds of campaign experiences. The hard job moved to a quieter question three days before launch: are we actually ready? And if not, what blocks us, what does it affect, and who acts next?

Proposed product exploration, not shipped. Concept-tested with 5 campaign operations participants. Baselines are estimates and targets are proposals.

Role
Lead product designer
Duration
~6 months
Focus
Readiness orchestration
Primary user
Campaign operations
Scope
5 core screens, interactive prototype
Campaign Command Center. The first screen answers “Are we ready?” Click to enlarge

At a glance

What I set out to design

Project type
Product exploration and validated operational prototype for campaign readiness, designed across Adobe’s GenStudio, AEM, and Workfront ecosystem.
Team
I led the design and worked with product designers, UX research, product management, and engineering.
Context
GenAI increased variant volume. Coordination became the bottleneck: reviews, localization, dependencies, ownership.
Problem
Object-level status existed across Adobe tools. A single operational decision did not: launch readiness.
My focus
A readiness and blocker-resolution layer: exceptions, impact, ownership, and safe next actions.
Outcome
A decision model, five core screens, and a working prototype. In concept testing with 5 participants, 19 of 20 tasks were completed without help and no one applied an unsafe change.
Scope

I owned

  • Readiness representation
  • Blocker prioritization
  • Dependency & change impact
  • Resolution routing with context

I did not own

  • Creation / Firefly experience
  • AEM DAM redesign
  • Workfront project management
  • Legal policy or journey builder

Why this problem

Creation scaled. Coordination didn’t.

Readiness is not a completion percentage

An illustrative model, not Adobe customer data, shows how quickly experience count grows once markets, channels, audiences, and variants multiply.

6 markets× 5 channels× 4 audiences× 3 variants= 360 experiences

Each experience can carry its own version, approval, localization, and activation state. 299 of 300 assets can be “done.” If the missing one is the required product hero, the campaign is not 99.7% ready.

That gap between status and readiness is the design problem I took on.

Evidence

What I observed before designing

No proprietary customer logs. The research drew on three inputs, chosen to ground the design in real operational constraints. The quote below is paraphrased from those sessions.

Research inputs

  1. 01Product walkthroughs

    GenStudio, AEM DAM, and Workfront workflows, traced to see how status and task dependencies travel across system boundaries.

  2. 02Public documentation

    Enterprise campaign management patterns, multi-market localization pipelines, and Workfront orchestration structures.

  3. 03Specialist conversations

    Semi-structured interviews and scenario mapping with 10 people: 4 product designers, 1 UX researcher, 2 product managers, and 3 engineers working on enterprise campaign tools.

Walkthrough

Readiness was reconstructed, not shown.

Operators opened Workfront for tasks, AEM for assets, and review for approvals, then rebuilt a mental model of launch risk. Often in a spreadsheet or Slack thread the night before go-live.

Failure mode

Late surprises clustered after “approved.”

A master offer or hero change after approval invalidated localized or already-routed experiences, with no clear impact map. The team found the fallout during activation prep, not at change time.

Constraint

Legal and brand would not accept AI as the decider.

Stakeholders were open to AI summaries and anomaly flags. Compliance review and regional overrides had to stay human-gated. That constraint became the principle “AI advises; policy governs; humans decide” before any UI existed.

Handoff gap

Context died at tool boundaries.

When ops routed a blocker into Workfront or AEM, the campaign, market, channel, and reason it was launch-critical often had to be explained again. Carrying context across tools became a requirement.

Operator signal

“I can tell you every asset’s status. I still can’t tell you if we should launch on Thursday.”

Paraphrased. That question is the one the Command Center has to answer first.

Hypothesis

Exception-first readiness beats a completion percentage.

Shifting the operator’s mental model from “how complete are we” to “what blocks launch, and what depends on it” should cut time to a launch decision under pre-launch pressure. The concept test below checked this.

Failure modes

  1. 01False green

    High completion with one launch-critical asset missing. Inventory said ready; the launch wasn’t.

  2. 02Orphan blockers

    Blocked items without an owner, due date, or downstream impact. Visible, but no path to action.

  3. 03Silent overwrite risk

    A global “update all” after a copy change threatened legitimate regional variants.

Design problem

Are we ready to launch?

Primary user: Campaign Operations, three days before a major launch. Creative, brand, legal, regional, and activation teams still own their work. This layer coordinates the decision without taking control from specialists.

I framed the product around that question, then around the follow-ups operators ask when the answer is no. These questions became the information architecture.

The rule I held: if a screen didn’t answer one of these questions, it didn’t make the core set, however useful it looked as a report.

  1. 01If not, why?
  2. 02What is blocked?
  3. 03What does it affect?
  4. 04Who owns the next step?
  5. 05What can safely move?

Evolution

How the model evolved

I explored three directions before the final one. Each looked right in a review and failed the operator under launch pressure.

Early direction: a completion-focused dashboard showing assets 99.7 percent, approvals 98 percent, localization 97 percent, and France marked complete, while a hidden France TikTok blocker affects 8 experiences
High completion hid the one blocker that mattered.Open full size ↗

Solution

One operational loop, five screens

Each screen answers one question in order: from uncertainty to a defensible launch decision, then into the right specialist tool, and back to an updated readiness state.

  1. Readiness
  2. Locate risk
  3. Prioritize
  4. Check impact
  5. Route & recheck

01Are we ready?

Campaign Command Center

The moment is three days out. I led with critical blockers and readiness by dimension, not vanity KPIs or a single AI score. Asset readiness reads 99.7%; launch readiness reads 78% with 3 blockers. Both are true, and the second one decides the launch.

Shows Launch countdown · Readiness by dimension · Critical vs waiting · Market and channel risk · Data freshness

Screen 01 · Command CenterClick to enlarge

02Where is the problem?

Market × Channel matrix

Markets as rows, channels as columns. Each cell is Ready, Needs review, Blocked, or N/A, shown with an icon and a label, never color alone. A critical-only mode cuts the grid to what can delay launch week.

Screen 02 · Market × Channel matrixClick to enlarge

03What first, and why?

Blocker queue

Ranked by launch criticality, dependencies, deadline, and severity, not by when the issue arrived. The side panel follows one pattern for every blocker: state, cause, impact, owner, action. The scenario that runs through every screen starts here: France · TikTok.

Screen 03 · Blocker queueClick to enlarge

04If we change this, what else changes?

Change Impact Signature screen

The master claim changes from “Save $100” to “Save 25%.” Before anything is applied, every affected experience is classified. Nothing ships through a blind “update all.”

Classifies Safe to update · Local override or review · Previously approved · Already activated · Unknown data

Screen 04 · Change ImpactClick to enlarge

05Who reviews, and did readiness update?

Approval & localization impact, then handoff

What changed (copy, image, layout, or CTA) decides which review is required. Work routes into Adobe Review, Workfront, or AEM with the campaign context attached, and readiness recalculates when it comes back.

Screen 05 · Approval & localization, then handoffClick to enlarge

Prototype

Try the flow yourself

A working prototype of the five screens, with sample data. A short guide shows what to click at each step, from the Command Center to a routed review. It takes about two minutes, and every other tab, filter, and button works too.

Preview of the interactive Project Nova prototype, opening on the Campaign Command Center
Open the prototype

Loads here. About 2 minutes, 5 steps.

Built for screens 1280px and wider. It opens on a phone, but works best on a laptop or desktop.

Sample data · Desktop recommended Open full screen ↗
  1. 01Command Center: open Markets × Channels
  2. 02Matrix: open the blocker queue for France · TikTok
  3. 03Queue: investigate, then review the change impact
  4. 04Change Impact: submit for review
  5. 05Handoff: send to reviewers with context attached

Tradeoffs

Five decisions, and what I gave up

In each case the obvious option was reasonable. It failed the operator three days before launch.

01 · Primary model

Inventory dashboard vs dependency-aware readiness

I chose exception-first readiness over complete inventory. See direction 01 in How the model evolved.

02 · Interaction model

AI copilot as primary UI vs structured decision surfaces

I chose structured decision surfaces, with AI as an advisor for summaries and anomaly explanations. See direction 02 in How the model evolved.

03 · Complexity exposure

Full dependency graph vs progressive disclosure

I chose progressive disclosure: Campaign → Market → Channel → Experience → Asset/Version. See direction 03 in How the model evolved.

04 · Change propagation

One-click “update all” vs impact-gated apply

Scenario: the master headline changes from “Save $100” to “Save 25%.” A single update-all would be fast and dangerous. Regional offers, prior approvals, and already-activated experiences carry different risks.

I chose Change Impact as its own screen: classify safe, needs review, local override, activated, and unknown, then apply only what policy and people allow. Slower, but nothing breaks silently.

05 · Automation boundary

Automated readiness score vs visible ambiguity

A single AI readiness score would feel decisive. It would also create false confidence when data is stale or incomplete.

I chose readiness by dimension, with data freshness and unknown states shown. Automate deterministic, low-risk actions; escalate ambiguity. The scoring model stays a cross-functional definition, so I didn’t invent an algorithm for this case.

Principles

Six rules every screen had to follow

  1. 01Exceptions over inventory

    Surface what needs attention. Don’t make ops inspect healthy objects.

  2. 02Impact before action

    Show what a change affects before it propagates.

  3. 03Explain cause, not only state

    “Blocked” without why, impact, and owner is incomplete.

  4. 04Preserve local intent

    Global updates must not silently overwrite regional decisions.

  5. 05AI advises; policy governs; humans decide

    No probabilistic auto-approval for legal or compliance.

  6. 06Context travels with work

    Handoffs into Adobe tools carry the campaign, object, blocker, and action.

Outcomes

How success would be measured

Each measure maps to an operator job. Today’s figures are working estimates from workflow observation. Targets are what I proposed for a production rollout. Concept test results follow below.

Operator job Measure Today (est.) Target
Answer readiness Time to a confident “ready / not ready” ~2.5–4 hrs < 35 min
Find the critical blocker Time to identify the launch-critical blocker and its owner ~45–90 min < 10 min
Understand impact Correct downstream impact in a change scenario ~55–65% ≥ 90%
Avoid unsafe changes Global applies made without an impact review Common path 0 without a gate
Trust the state Self-reported confidence in the readiness answer ~3 / 5 ≥ 4.2 / 5
Fewer late surprises Launches with a critical blocker found < 48h before go-live ~30–40% < 15%

Validation

What concept testing showed

5 participants, experienced campaign operations managers and enterprise marketing producers, ran four pre-launch tasks on the desktop prototype. Times come from the prototype with sample data. They show the model works, not real-world savings.

19 / 20tasks completed without help 0unsafe applies 4.6 / 5average confidence

Task 1

“Launch is in three days. Are we ready?”

5 / 5 unaided · 18 s average · confidence 4.8 / 5

No errors. One participant paused to compare the 99.7% asset figure with the 78% launch readiness score before answering.

“Usually I’d have to ping three regional leads on Slack to know if we’re actually good for Thursday. Seeing 78% right next to the 3 blockers immediately tells me we’re not ready without me having to guess.”

Task 2

“Why is France · TikTok blocked, and what is affected?”

5 / 5 unaided · 42 s average · confidence 4.6 / 5

One participant opened campaign settings first, then found the blocked cell in the matrix.

“The side drawer giving me the root issue, owner, and the exact 8 affected experiences in one view is huge. I don’t have to open Workfront in another tab to figure out who owns the legal hold.”

Task 3

“The global offer changed. Which experiences need review?”

4 / 5 unaided · 1 min 15 s average · confidence 4.2 / 5

One participant needed a prompt to find the Change Impact entry point. Two hesitated over the difference between “Local override” and “Previously approved.” This was the weakest task, and it shaped the changes below.

“Normally a copy change like this terrifies me because someone hits ‘apply all’ and wipes out custom French pricing.”

Task 4

“Apply the change without overwriting regional work.”

5 / 5 safe · 35 s average · confidence 4.9 / 5

No unsafe applies. The impact gate kept regional overrides out of the bulk update for every participant.

Iterations

What changed after testing

01 · Command Center

Asset completion and launch readiness read too alike

In Task 1, the 99.7% asset figure drew attention before the 78% launch readiness score.

I changed the hierarchy. Launch readiness leads as the large card with the critical blockers beside it. Asset readiness became a secondary figure that reads “1 asset pending.”

02 · Change Impact

The impact classes needed definitions

In Task 3, participants paused to work out how “Local override” differs from “Previously approved.”

Next iteration: inline definitions and an icon for each class, so operators know why an experience is flagged before any bulk action. Not yet in the prototype.

03 · Handoff

Reviewers had to see why it was urgent

Participants wanted proof that the regional legal reviewer in Workfront would understand the urgency without a follow-up message.

I changed the handoff panel to lead with “Context preserved”: campaign, market, channel, owner, and due date travel with every request, followed by why it was routed.

Reflection

What held up, and what I’d test next

What held up

Treating readiness as a derived property of the campaign, not a progress bar. Once the screens followed the operator’s questions in order, the scope stayed small: five screens inside an ecosystem I deliberately didn’t redesign.

Test first

Whether operators trust a readiness answer when data freshness is low. Whether critical-only mode hides something they need. Whether legal reviewers find the routed context complete enough to act without asking again.

Open question

The readiness scoring definition. It belongs to operations, legal, and engineering together, not to design alone. My next step would be a draft model reviewed with all three before building further.